Difference between revisions of "AutoTest Integration"

(Links: added skeletton for input gui (EiffelBuild project))
(Team: updating tasks)
Line 54: Line 54:
 
=Team=
 
=Team=
  
* [[User:Wliu|Weiqiang Liu]] (project leader; libero)
+
* [[User:Wliu|Weiqiang Liu]] (project leader; code: output)
 
* [[User:jong|Je Lan Ong]] (doc)
 
* [[User:jong|Je Lan Ong]] (doc)
* [[User:Psamuel|Samuel Pasquier]] (doc,output; testing)
+
* [[User:Psamuel|Samuel Pasquier]] (doc: output; testing)
 
* [[User:Philipp|Philipp Bönhof]] (code: input interface; wiki)
 
* [[User:Philipp|Philipp Bönhof]] (code: input interface; wiki)
 
* [[User:Pgoffin|Pascal Goffin]] (doc)
 
* [[User:Pgoffin|Pascal Goffin]] (doc)
Line 66: Line 66:
 
* [[User:arnofiva|Arno Fiva]] (code: specification autotest)
 
* [[User:arnofiva|Arno Fiva]] (code: specification autotest)
 
* Carlo Manco (code: autotest)
 
* Carlo Manco (code: autotest)
* Matthieu Bray (design; testing)
+
* Matthieu Bray (testing)
 
* [[User:ilinca_ciupa|Ilinca Ciupa]] (assistant)
 
* [[User:ilinca_ciupa|Ilinca Ciupa]] (assistant)

Revision as of 01:49, 1 June 2006


Overview

Project name: AECCS (Advanced Eiffel Contract Checking System)

Project description: integration of AutoTest into EiffelStudio

Mailing list: es-autotest@origo.ethz.ch

Milestones

M1: April 25th 2006

  • project page has been set up
  • members are on the team list
  • organizing meetings

M2: May 2nd 2006

  • team divided in sub groups
  • divided the project in its components
  • we need to treat AutoTest as black box (unless the developper is able to cope with the problems with Eiffel 5.7)

To Do

  • create a logo
  • caller interface, output interface
  • interface to autotest

Hints for the work

  • Do the same thing in two groups simultaneously, probably one group has solved some problems faster than the other.

Links

Meetings

  • Thursday June 1th 13-14h (room IFW E 44) (?)

Protocols

The protocols and other links are mainly in german.

Team