Difference between revisions of "TODOs"

 
Line 4: Line 4:
 
* Design and vote on a new EiffelStudio logo (responsible: [[User:Bayt| Bayt]])
 
* Design and vote on a new EiffelStudio logo (responsible: [[User:Bayt| Bayt]])
 
** Replace favicon of page with logo (responsible: [[User:Bayt| Bayt]])
 
** Replace favicon of page with logo (responsible: [[User:Bayt| Bayt]])
* Put URL to the Mailinglist software on the page (responsible: [[User:Bayt| Bayt]])
 
 
* Put introductory text from Bertrand on the page (responsible: [[User:Bayt| Bayt]])
 
* Put introductory text from Bertrand on the page (responsible: [[User:Bayt| Bayt]])
 
* Get valid ssl certificate from Switch (responsible: [[User:Luc| Luc]])
 
* Get valid ssl certificate from Switch (responsible: [[User:Luc| Luc]])
 
* Migration of yahoogroup mailinglist here after EiffelWorld newsletter (responsible: [[User:Luc| Luc]])
 
* Migration of yahoogroup mailinglist here after EiffelWorld newsletter (responsible: [[User:Luc| Luc]])
 
** Give list of subscribed people to [[User:Luc| Luc]] (responsible: [[User:Manus| Manus]])
 
** Give list of subscribed people to [[User:Luc| Luc]] (responsible: [[User:Manus| Manus]])

Revision as of 11:36, 4 April 2006

Here is the list TODOs for the entire project buildup:

  • Design and vote on a new EiffelStudio logo (responsible: Bayt)
    • Replace favicon of page with logo (responsible: Bayt)
  • Put introductory text from Bertrand on the page (responsible: Bayt)
  • Get valid ssl certificate from Switch (responsible: Luc)
  • Migration of yahoogroup mailinglist here after EiffelWorld newsletter (responsible: Luc)
    • Give list of subscribed people to Luc (responsible: Manus)