TODOs

Revision as of 09:40, 4 April 2006 by Bayt (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Here is the list TODOs for the entire project buildup:

  • Design and vote on a new EiffelStudio logo (responsible: Bayt)
    • Replace favicon of page with logo (responsible: Bayt)
  • Put URL to the Mailinglist software on the page (responsible: Bayt)
  • Put introductory text from Bertrand on the page (responsible: Bayt)
  • Get valid ssl certificate from Switch (responsible: Luc)
  • Migration of yahoogroup mailinglist here after EiffelWorld newsletter (responsible: Luc)
    • Give list of subscribed people to Luc (responsible: Manus)