TODOs

Revision as of 21:42, 23 April 2006 by Bayt (Talk | contribs) (updated todo's)

Here is the list TODOs for the entire project buildup:

  • create SA branch (responsible: Bernd)
  • Design new EiffelStudio logo (responsible: Bayt)
    • done, waiting for feedback
    • Replace favicon of page with logo (responsible: Bayt)
  • Get valid ssl certificate from Switch (responsible: Bayt)
  • Migration of yahoogroup mailinglist here after EiffelWorld newsletter (responsible: Luc)
    • Give list of subscribed people to Luc (responsible: Manus)
  • Automatic build scripts (responsible: Bernd) and coordinate with Daniel for Debian uploads.