TODOs
Here is the list TODOs for the entire project buildup:
- Design and vote on a new EiffelStudio logo (responsible: Bayt)
- Replace favicon of page with logo (responsible: Bayt)
- Put URL to the Mailinglist software on the page (responsible: Bayt)
- Put introductory text from Bertrand on the page (responsible: Bayt)
- Get valid ssl certificate from Switch (responsible: Luc)
- Migration of yahoogroup mailinglist here after EiffelWorld newsletter (responsible: Luc)