== Summary ==
 
== Summary ==
CDD is an extension to EiffelStudio that provides support for both automatic test case extraction and test execution.
+
The Contract Driven Development (CDD) Extension to EiffelStudio provides support for
It is undisruptive to the development process of the user. The tool is in its early stages. Feedback and bug reports are
+
* Automatic Test Case Extraction (Test cases are extracted from failures without intervention from the user)
very much appreciated. Please send them to mailto:andreas.leitner@inf.ethz.ch and or use the  discussion page for this article.
+
* Integration of manually written unit test cases
 +
 
 +
CDD is undisruptive to the development process of the user. If you have questions, feedback or would like to report a bug please visit (TODO: inser forum link here)
  
  

Revision as of 03:20, 27 January 2008


Summary

The Contract Driven Development (CDD) Extension to EiffelStudio provides support for

  • Automatic Test Case Extraction (Test cases are extracted from failures without intervention from the user)
  • Integration of manually written unit test cases

CDD is undisruptive to the development process of the user. If you have questions, feedback or would like to report a bug please visit (TODO: inser forum link here)


Video still.png

Play Video!

Old Documentation

At this point there is only outdated documentation. It is available from CddOldDocumentation

Testing

Development (Todo's):

Schedule

  • 04.01.2008: Final experiment definition (questions to ask, how to conduct experiment)
  • 08.01.2008: Finalized list of features to go in release (including logging and log submission)
  • 27.01.2008: Beta 1 (feature complete version online)
  • 04.02.2008: Beta 2 (designated testers test release, # > 3)
  • 11.02.2008: Beta tester feedback in
  • 18.02.2008: Final CDD release for experiment online
  • 19.02.2008: Initial Questionnaire
  • 25.03.2008: Midterm Questionnaire
  • 19.05.2008: Final Questionnaire
  • 20.05.2008: Having all data
  • 06.06.2008: Finished analysis

Stefans Master Plan

  • MA Start ca 17.12.2007
  • MA End ca 17.6.2008
  • Testing the tester
    • System level test for CDD (incl. framework)
    • Recreating existing unit test suite with CDD
    • Large scale validation of CDD
      • Info 4 and/or Software Engineering
      • Questions
        • Does testing (manual/extracted) increase developer productivity?
        • How many tests do ppl end up with (manual/extracted)?
        • ...


Specifications

Things we need from estudio

  • Invariants should be checked during debugging equally to pre- and post conditions (they could also be visualised in the flat view the same way like pre- and post conditions are)
  • The information whether some call is a creation call or a normal routine call (Not sure if this is really necessary, what if we assume every call to some creation procedure is always a creation call?)
  • Support for multiple open targets